50t Ladle Refining Furnace for Steel Mill
Basic Info.
Model NO. | 50T |
Power Source | Electric |
Type | Sintering Furnace |
Automatic Grade | Automatic |
Customized | Customized |
Transport Package | Nude, Wooden Case |
Specification | Customized |
Trademark | VILLE |
Origin | China |
HS Code | 8514300020 |
Production Capacity | 100 Sets Per Year |
Product Description
1. Main Technical Parameter Ladle rated capacity 50T Free board 600mm (for 40tons molten steel) Ladle car travel speed 2-20m/min Ladle car driving method Mechanical, VVVF Ladle car position accuracy ±10mm Roof construction Water cooled ,tubular Roof lifting distance 400mm Electrode diameter Ф350mm Pitch circle diameter Ф600mm Electrode lifting distance 2200mm Electrode travel speed 4m/min(up, automatic) 3m/min(down,automatic Temperature rising rate ≥4ºC max 5ºC after heat balance Transformer capacity 10MVA+20% Primary voltage 22KV, 3 P, 50Hz Number of taps and voltage steps 5 (off-load) Cooling mode OFWF Short net Impedance ≤2.4mΩ Three phase unbalance ≤4% Hydraulic pressure 12MPa Hydraulic medium Water-glycol Water pressure 0.5MPa (for roof cooling) 0.3MPa(for the other) Inlet water temperature ≤35ºC Outlet water temperature ≤55ºC Total water consumption 250m3/h Compressed air pressure 0.4-0.6Mpa Compressed air flow rate 120L/min Argon gas pressure 0.8Mpa (max 1.6Mpa) Argon flow rate 250L/min(max)2. Scope of Supply
SN | Item | Qty | Remark |
1 | Water cooled roof | Tubular | |
3 | Guide rollers & frame | 1 set | |
4 | Electrode lifting mechanism | 1 set | |
5 | Cooling water system | 1 set | |
6 | Manual temp. measuring & sampling device | 1 set | |
7 | Lubrication system | 1 set | Xi'an or Qidong |
8 | Compressed air device | 1 set | |
9 | Argon system | 1 set | |
10 | Hydraulic system | 1 set | Proportional valve & pump make: Parker |
11 | Short network | 1 set | |
12 | 10MVA furnace transformer c/w oil/water cooler | 1 set | Tap changer make: ABB |
13 | H.V. Switchboard (GBC40.5kV) | 1 set | S*chneider china VCB |
14 | L.V. power distribution & control panels | 1 set | |
15 | PLC control system | 1 set | Siemens S7-300 |
16 | Wire feeding machine | 1 set | Gongyi |
17 | Electrodes nippling station | 1 set | |
18 | Steel temperature & measuring thermometer | 1 set | with LED display |
1) Installation and installation materials, Hydraulic medium, lubrication medium and cleaning medium,Graphite electrodes, Furnace refractory lining;
2) Civil works and design (Seller provides furnace foundation drawings and civil work requirements),embedded furnace foundation parts;
3) Water supply and gas supply main inlet are laid to Seller's equipment connection point, H.V.incoming line is connected to Seller's H.V. panel and furnace transformer terminals, L.V. line isconnected to Seller's L.V. distribution panel.
Sales team:
Our Services
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan,and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testinng. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months gurantee period normally. |
FAQ
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of starndard you follow? |
A: | IEC, ANSI,GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation,outline drawing,manufacturing plan, quality control plan |
5. Q: | What is your normal wanrranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commissioningin user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |
8. Q: | Are you manufacturer or trading company? |
A: | Manufacturer with own import & export company. |
Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
Global Service
--Wherever you are, VILLE global network will support and provide you with value.
Quick Response
--In response to your needs without delay, VILLE knows the value of your time.
Thanks for choosing VILLE as your reliable partner andplease trust both of us will create a brilliant future!